Data chart + industry explainer

India solar capacity by state, month and technology

Compare published solar capacity in September and October 2026 by state and technology, with full MNRE data, sortable values and a CSV download.

Open MNRE’s October state capacity report
An array of solar panels on a residential roof in Kerala
A 3 kW household rooftop solar installation in Kerala, January 2026 · Photograph by Dr. Chinchu C., resized · CC BY 4.0

India’s installed solar capacity

India had 174,547.05 MW of installed solar capacity on 31 October 2026, and Rajasthan led the states with 45,627.96 MW. Gujarat led rooftop solar with 8,735.39 MW, while the national rooftop and off-grid figures already included the capacity reported in those categories under PM Surya Ghar and PM-KUSUM Component B, respectively.

Ground-mounted solar accounted for 127,330.66 MW, about 73% of the national total. Rooftop solar stood at 34,966.92 MW, about 20%. The remaining capacity was reported under the solar component of hybrid projects, at 5,620.21 MW, and off-grid solar, at 6,629.26 MW. On a gigawatt scale, the national total comes to about 174.55 GW. Divide megawatts by 1,000 to make that conversion.

Installed capacity measures power. To find how much electricity the installations produced in October, look for generation over that month in megawatt-hours or gigawatt-hours. A capacity ranking alone cannot establish a generation ranking. Two states with the same installed MW can produce different amounts of electricity over the same period, and capacity commissioned late in a month contributes for less of that month.

Use the all-solar total to compare the scale of installations across states. For a question about how solar is deployed, choose the technology column that matches it. Use the rooftop column for the market across homes and other rooftop customers, and turn to separate programme reporting for participation under a specific scheme. Keep the date and the unit visible when carrying any figure into a comparison.

How state rankings change by technology

Rajasthan’s lead over Gujarat in total capacity was 8,836.12 MW. Ground-mounted solar explains much of that gap. Rajasthan had 39,618.95 MW in that category, compared with 26,202.27 MW in Gujarat. The rooftop ranking goes the other way. Gujarat was first, followed by Maharashtra at 6,202.16 MW, and both had substantially more rooftop capacity than Rajasthan’s 2,434.53 MW.

Download this table (.csv)

MNRE installed solar capacity by state, territory and technology, in MW
JurisdictionSnapshotLGD codeGround-mountedRooftopHybrid solarOff-gridTotal solar
India total31 October 2026—127,330.6634,966.925,620.216,629.26174,547.05
Andaman and Nicobar Islands31 October 20263525.057.82—0.2733.14
Andhra Pradesh31 October 2026286,898.831,314.54679.7688.828,981.95
Arunachal Pradesh31 October 2026121.276.68—9.1717.12
Assam31 October 202618220.96659.17—12.64892.77
Bihar31 October 202610315.74276.53—21.28613.55
Chandigarh31 October 202646.3473.09—0.8180.24
Chhattisgarh31 October 2026221,490.05431.59—391.072,312.71
Dadra and Nagar Haveli and Daman and Diu31 October 20263814.30129.72——144.02
Delhi31 October 202679.84461.33—1.46472.63
Goa31 October 2026308.5294.80—1.49104.81
Gujarat31 October 20262426,202.278,735.391,653.66200.5336,791.84
Haryana31 October 20266267.761,464.77—1,214.202,946.73
Himachal Pradesh31 October 20262284.0071.50—34.58390.09
Jammu and Kashmir31 October 202612.49242.60—38.75283.84
Jharkhand31 October 202620121.0098.66—227.74447.40
Karnataka31 October 20262910,924.47953.21586.75231.6512,696.07
Kerala31 October 202632342.272,385.74—25.072,753.08
Ladakh31 October 2026376.0012.26—1.3519.61
Lakshadweep31 October 2026312.454.63—2.529.60
Madhya Pradesh31 October 2026235,421.361,124.88—197.776,744.00
Maharashtra31 October 20262712,196.306,202.16—2,249.9320,648.39
Manipur31 October 2026140.6011.46—6.3918.45
Meghalaya31 October 202617—0.21—4.074.28
Mizoram31 October 20261522.006.75—7.1235.87
Nagaland31 October 202613—2.19—2.584.77
Odisha31 October 202621727.96548.62—84.671,361.25
Puducherry31 October 2026341.0393.52—0.1894.73
Punjab31 October 20263886.77702.86—117.021,706.65
Rajasthan31 October 2026839,618.952,434.532,700.04874.4445,627.96
Sikkim31 October 2026110.525.12—1.927.56
Tamil Nadu31 October 20263312,927.721,676.98—75.9114,680.62
Telangana31 October 2026364,360.49818.76—8.755,188.00
Tripura31 October 2026167.9419.25—23.6450.83
Uttar Pradesh31 October 202693,193.123,394.83—380.636,968.58
Uttarakhand31 October 20265541.05431.64—32.681,005.37
West Bengal31 October 202619281.2369.13—13.14363.50
Others31 October 2026————45.0145.01
India total30 September 2026—125,650.6933,409.045,362.476,629.26171,051.46
Andaman and Nicobar Islands30 September 20263525.057.50—0.2732.82
Andhra Pradesh30 September 2026286,587.421,128.60600.5688.828,405.40
Arunachal Pradesh30 September 2026121.276.68—9.1717.12
Assam30 September 202618220.96621.30—12.64854.90
Bihar30 September 202610302.16248.80—21.28572.24
Chandigarh30 September 202646.3471.70—0.8178.85
Chhattisgarh30 September 2026221,477.05378.80—391.072,246.92
Dadra and Nagar Haveli and Daman and Diu30 September 20263814.30129.10——143.40
Delhi30 September 202679.84454.30—1.46465.60
Goa30 September 2026308.5292.20—1.49102.21
Gujarat30 September 20262425,902.078,525.101,606.86200.5336,234.55
Haryana30 September 20266267.761,417.40—1,214.202,899.36
Himachal Pradesh30 September 20262284.0066.70—34.58385.29
Jammu and Kashmir30 September 202612.49230.30—38.75271.54
Jharkhand30 September 20262071.0096.70—227.74395.44
Karnataka30 September 20262910,584.53945.10586.75231.6512,348.02
Kerala30 September 202632342.272,259.50—25.072,626.84
Ladakh30 September 2026376.0011.40—1.3518.75
Lakshadweep30 September 2026312.454.40—2.529.37
Madhya Pradesh30 September 2026235,346.461,075.60—197.776,619.82
Maharashtra30 September 20262712,171.305,978.70—2,249.9320,399.93
Manipur30 September 2026140.6010.60—6.3917.59
Meghalaya30 September 202617—0.21—4.074.28
Mizoram30 September 20261522.006.40—7.1235.52
Nagaland30 September 202613—1.90—2.584.48
Odisha30 September 202621725.96471.20—84.671,281.83
Puducherry30 September 2026341.0391.30—0.1892.51
Punjab30 September 20263886.77696.50—117.021,700.29
Rajasthan30 September 2026839,363.102,315.602,568.30874.4445,121.44
Sikkim30 September 2026110.525.12—1.927.56
Tamil Nadu30 September 20263312,641.871,635.80—75.9114,353.58
Telangana30 September 2026364,360.49795.90—8.755,165.14
Tripura30 September 2026167.7918.20—23.6449.63
Uttar Pradesh30 September 202693,185.043,134.90—380.636,700.57
Uttarakhand30 September 20265541.05406.40—32.68980.13
West Bengal30 September 202619281.2369.13—13.14363.50
Others30 September 2026————45.0145.01

A rooftop comparison can ask about absolute capacity or about the share rooftop makes up in a state. Uttar Pradesh had 3,394.83 MW of rooftop solar, more than Kerala’s 2,385.74 MW. Kerala had the larger rooftop share, about 87% of its published total compared with about 49% in Uttar Pradesh. The first measure compares the scale of rooftop installations. The second shows how heavily each state’s solar mix relies on rooftop capacity.

Maharashtra and Tamil Nadu show why a close comparison should use the full set of categories. Tamil Nadu had 731.42 MW more ground-mounted solar. Maharashtra’s larger rooftop and off-grid figures put it 5,967.77 MW ahead in the published total. A claim that one state leads the other should name the column behind the claim, especially when large projects and distributed solar point in different directions.

The state and union territory rows record where equipment is installed. Follow a separate electricity trade or procurement source if the question is who buys the output. The table also has a national line called Others, with 45.01 MW reported under off-grid solar. Keep it in the national accounting and leave it outside a ranking of named places.

The table shows all 36 states and union territories present in each ministry document, plus the India total and the unallocated Others line. Choose the September or October snapshot, and sort the technology column you need. Dashes mark blanks in the source and appear below reported numbers when sorted. The CSV contains both snapshots even when the display is filtered. Retain the published total to preserve differences due to rounding.

Monthly changes and financial-year totals

India’s published total rose from 171,051.46 MW on 30 September 2026 to 174,547.05 MW on 31 October, a difference of 3,495.59 MW. To compare states over that interval, subtract September’s total from October’s total for each state. Gujarat rose by 556.86 MW and Rajasthan by 506.52 MW. Gujarat’s larger change narrowed the gap, and Rajasthan retained the lead in cumulative capacity.

October minus September capacity, selected states, as published by MNRE
Andhra Pradesh
576.55 MW
Gujarat
557.29 MW
Rajasthan
506.52 MW
Tamil Nadu
327.04 MW
Maharashtra
248.46 MW

Category changes show what moved within a state. In Uttar Pradesh, reported rooftop capacity rose from 3,134.90 MW to 3,394.83 MW, an increase of 259.93 MW. Its ground-mounted figure rose by 8.08 MW and its off-grid figure stayed at 380.63 MW. The published total increased by 268.01 MW, so rooftop accounted for almost all of the measured increase in that comparison.

Haryana illustrates how to isolate a change within the same jurisdiction. From September to October, the reported ground-mounted and off-grid numbers stayed at 267.76 MW and 1,214.20 MW respectively. Rooftop increased from 1,417.40 MW to 1,464.77 MW, accounting for the 47.37 MW difference in the published total. Read the two month-end rows before attributing movement to a technology. A project-level source is needed to identify which installations account for an increase.

MNRE reported 24,286.35 MW added from 1 April through 31 October in FY2026–27. Its figure for the completed FY2025–26 was 44,614.25 MW. The current figure covers seven months, which makes a comparison with April through October of the previous year the appropriate way to assess change at the same point in the financial year. Use the eventual full-year release for a comparison of completed years. Two monthly snapshots establish a change for one interval and leave a longer trend to a longer series.

PM Surya Ghar and residential rooftop solar

PM Surya Ghar launched on 13 February 2024, and the residential operational guidelines record government approval on 29 February 2024. The programme was approved for planned delivery through FY2026–27 with a target of rooftop systems for one crore households. The sanctioned outlay of ₹75,021 crore covers all programme components. It belongs alongside the programme’s planned scope and gives no estimate of what an individual installation costs.

The Press Information Bureau reported 65.26 lakh households benefiting as of 2 November 2026. One crore equals 100 lakh, so the reported count is numerically about 65% of the household target. Keep the source’s term ‘households benefiting’ when quoting that count. A count of applications, approvals or households receiving a payment would answer a different question and needs a figure published for that particular stage.

The same backgrounder, published on 13 November, reported 19.1 GW commissioned under PM Surya Ghar. MNRE’s 34.96692 GW rooftop figure covers the wider grid-connected rooftop category as of 31 October, including programme capacity within its scope. Adding 19.1 GW to that category would double-count overlapping capacity. An exact programme share requires figures with a common reference date and aligned reporting definitions.

For a household checking whether to pursue the scheme, start with the residential electricity connection. The ministry’s July 2026 parliamentary reply describes household participation in terms of residential customers with a grid-connected connection from the local distribution company. Check the official PM Surya Ghar portal and current residential guidance for the rules that apply to the connection. Look for amendments as well as the original guidelines. The residential guidance was amended on 7 July 2025, and a dated approval document alone gives an incomplete picture of current rules.

PM-KUSUM and agricultural solar

PM-KUSUM covers decentralised grid-connected renewable power plants, standalone agricultural solar pumps under Component B, and solarisation of existing grid-connected agricultural pumps under Component C. The monthly capacity table explicitly includes Component B in off-grid solar. A question about the programme’s overall reach requires programme records that cover all relevant components, including those with a grid connection.

Haryana illustrates how much the choice of column matters. Its October row records 1,214.20 MW of off-grid solar and 267.76 MW of ground-mounted solar. In Kerala, the corresponding figures are 25.07 MW and 342.27 MW. These figures compare the reported capacity mix in each state. To compare standalone pump installations, look for Component B pump counts by state and check the reporting date and whether the count refers to sanctioned or installed pumps.

The national off-grid figure was 6,629.26 MW at both the September and October snapshots. That equality establishes the reported position in this capacity series. To see whether applications, sanctions or installations progressed during October, use dated component-level reporting. For participation rules, use the official PM-KUSUM portal to identify the component that matches the existing pump and connection, then check the current guidance for the state concerned. A state’s accumulated off-grid capacity gives no indication of whether an application round is open.

Floating solar and storage targets

The government approved Pradhan Mantri Surya Sarovar Yojana on 31 July 2026. The 13 November government backgrounder gives targets of 5,000 MW of floating solar and 10,000 MWh of co-located storage, with sanctioning contemplated from FY2026–27 through FY2030–31. The sanctioning window describes the plan for project approvals. Look for dated commissioning records to establish when capacity actually entered service.

Read those targets in their own units. The solar figure expresses power capacity, while the storage figure expresses how much energy the storage can hold. A storage discharge-duration calculation needs the storage system’s own discharge power rating in MW together with its energy capacity in MWh. The paired solar target supplies no such storage rating. Keep both targets outside the October installed-capacity arithmetic, and use project or programme records if you need a floating-solar breakdown. The October state table has no dedicated floating-solar column.

How to verify the next release

Start with MNRE’s cumulative physical achievements release and open the accompanying state and union territory document. The October companion table was released on 12 November 2026 and describes capacity on 31 October. Read the date printed in the document itself. The preceding PDF reports capacity on 30 September 2026, and its server path gives a different impression of its age. The monthly release and the annual statistical edition serve different reporting intervals.

MNRE compiles monthly state figures from implementing agencies and state governments. When updating a comparison, check the national figure against the new state document and copy each published total as shown. In October, Gujarat’s four displayed components add to 36,791.85 MW, while the official total is 36,791.84 MW. That 0.01 MW difference can arise from rounding. Preserve dashes as unreported or blank entries so a spreadsheet or chart does not turn them into measured zeros.

When updating a programme figure, record the date the number describes and the date the government published it. A later publication can still report an earlier milestone. Check the noun and the unit alongside the date. Households, pumps, commissioned megawatts and storage megawatt-hours each describe a different measure. Matching all three details lets a reader reproduce a comparison when the next release arrives.

Sources